PROJECT NAMENAME OF CLIENT CONTRACTOR NAMEWORK DESCRIPTIONPERIOD & STATUS
Repair Fuel Line Leak at KKABSAUDI ARABIAN OIL COMPANY (ARAMCO) Conti-TechRepair of 8” Jet Air fuel line in King Khalid Air Base, Khamis Mushayat 2018
WRAPPING ACTIVITIES AT AINDAR GOSP-4 SAUDI ARABIAN OIL COMPANY (ARAMCO) Conti-TechRepair of 8” Recycle line inside Aindar GOSP-4.2018
Construction & Installation of Terminal Compound at SS#8814, Al-Assiyah, Qassim SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) Civil works for the construction of terminal compound 2016
SFC - I NSTALL NOTMETALLIC WRAPPING MATERIALS SAUDI ARABIAN OIL COMPANY (ARAMCO) Conti-TechNon-Metallic A+ wrapping of 36” Crude Oil Pipeline in Khursaniyah.2018
Wrapping of process line SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY (SATORP) Conti-TechWrapping of 36” process pipe line for liquid Naphthol in Jubail 2018
Construction & Installation of two Terminal Compounds at Al-Russ City SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) Civil works for the construction of terminal compounds 2016
Fire Alarm System for 56" EWG-2 Loop-2 & 56" KAEC Pipeline SAUDI ARABIAN OIL COMPANY (ARAMCO) DODSAL Civil, electrical and infrastructure works for camp facilities 2014 - 2015
SFC -Wrapping activities at Aps-8 & UA Plants SAUDI ARABIAN OIL COMPANY (ARAMCO) Conti-TechA+ Wrapping of various pipeline repairs in Abqaiq APS-8 & UA Plants 2018
Construction of Two 132 KV DC OHL for Al-Badaya S/S 8851 in Qassim Area SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2017
Precast of Valves Chambers for the Pipeline Project Ma’Aden GoldMetals Services for Trading & Cont. Co (MSTCC) Installation of ARV, WOV, and IV Chambers, precast of Valves Chambers for the Pipeline2012 - 2013
Infrastructure facilities (Utility, Electrical, flood lighting, Civil, Fire Alarm, Fire Water, Installation of 500kva Generator sets) etc. SAUDI ARABIAN OIL COMPANY (ARAMCO) DODSAL Civil, electrical and infrastructure works for camp facilities 2014 - 2015
Installation of 132 KV U/G Cable circuits from S/S 8846 up to BSP SS9025, Al-Russ SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2016
Design, Supply, Installation & testing of Fire water lineSAUDI ARABIAN OIL COMPANY (ARAMCO) WWWCivil, piping and pipeline work to furnish fire water line 2014 - 2016
Electrical Works for 56" EWG-2 Loop-2 & 56" KAEC Pipeline SAUDI ARABIAN OIL COMPANY (ARAMCO) DODSAL Civil, electrical and infrastructure works for camp facilities 2014 - 2015
Connection of new Hail City SIS # 8926 with 132 kV Network in Hail SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2017 - 2018
Installation of 132 kV U/G Cable Circuits for S/S #8843 from BSP 9059 in Unaizah. SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2016 - 2018
Installation of 132 KV U/G Cable circuits for S/S 8845 in Buraydah, Qassim AreaSAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2015 - 2016