Projects list

PROJECT NAMENAME OF CLIENT CONTRACTOR NAMEWORK DESCRIPTIONPERIOD & STATUS
Electrical & Instrumentation Works In Contract 318-C01 Subdivision And Development Of Industrial Zone –Phase 1Royal CommissionFMSCOMV & HV Cable installation, Termination and testing of cables, Installation of Panels, generators, Control Centers, Lighting fixtures, etc.Ongoing
Telecommunication Works In Contract 318-C01 Subdivision And Development Of Industrial Zone –Phase 1Royal CommissionFMSCOInstallation of FOC cables, Splicing, termination and testing, Installation of IP Telephony system, Switches, patch panels, FDT, Splice closures, EtcOngoing
Construction of Pipeline Chambers with ancillaryworksNational Water Company(NWC)TECTONPipeline Chamber Works and Electrical Works in PSW, PSD &PSTOngoing
UG Cabling Works forRe‐
Conductoring of 132kV DC OHTL between Al‐ Jouf PP and Sakaka
Saudi Electric Company(SEC)Larsen & Toubro (L&T)UG Cabling works including layingof
132kv HV cable along with FOC Cable and construction of Joint Bay, manhole, Handhole andductbanks
Ongoing
Offshore Parking Shade foundationworkSaudi ArabianOil Company (ARAMCO)Zamil Architectural Industries(Zamil)Foundation Works for Offshore Parking Shade inRas‐Tanurah2018-2019
Connection of new Hail CitySIS
# 8926 with 132 kV Network in Hail
Saudi Electric Company(SEC)Larsen & Toubro (L&T)UG Cabling works including layingof
132kv HV cable along with FOC Cable and construction of Joint Bay, manhole, Handhole andductbanks
2017 ‐2018
Electrical works in New Factory Building at Al-KharjSaudi Electric Company(SEC)United Carton /ZamilMV & HV Cabling Works, Installation of panels, Cable tray installation, Grounding works and testing.2017 ‐2018
Construction of Two 132 KV DC OHL for Al‐Badaya S/S 8851 in QassimAreaSaudi Electric Company(SEC)Larsen & Toubro (L&T)UG Cabling works including layingof
132kv HV cable along with FOC Cable and construction of Joint Bay, manhole, Handhole andductbanks
2017
Installation of 132 kV U/G Cable Circuits for S/S #8843 from BSP 9059 inUnaizah.Saudi Electric Company(SEC)Larsen & Toubro (L&T)UG Cabling works including layingof
132kv HV cable along with FOC Cable and construction of Joint Bay, manhole, Handhole andductbanks
2016 ‐2018
nstallationof132KVU/GCablecircuitsfromS/S8846uptoBSPSS9025,Al‐RussSaudi Electric Company(SEC)Larsen & Toubro (L&T)UG Cabling works including layingof
132kv HV cable along with FOC Cable and construction of Joint Bay, manhole, Handhole andductbanks
2016
Construction & Installation of two Terminal Compounds at Al‐ RussCitySaudi Electric Company(SEC)Larsen & Toubro (L&T)Civil works for the construction of terminal compounds for OH Power line.2016
Wrapping of process line SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY (SATORP) Continental Contracting Co. (Conti-Tech) Wrapping of 36” process pipe line for liquid Naphthol in Jubail 2018
WRAPPING ACTIVITIES AT AINDAR GOSP-4 SAUDI ARABIAN OIL COMPANY (ARAMCO) Continental Contracting Co. (Conti-Tech) Repair of 8” Recycle line inside Aindar GOSP-4.2018
Repair Fuel Line Leak at KKABSAUDI ARABIAN OIL COMPANY (ARAMCO) Continental Contracting Co. (Conti-Tech) Repair of 8” Jet Air fuel line in King Khalid Air Base, Khamis Mushayat 2018
SFC -Wrapping activities at Aps-8 & UA Plants SAUDI ARABIAN OIL COMPANY (ARAMCO) Continental Contracting Co. (Conti-Tech) A+ Wrapping of various pipeline repairs in Abqaiq APS-8 & UA Plants 2018
SFC - I NSTALL NOTMETALLIC WRAPPING MATERIALS SAUDI ARABIAN OIL COMPANY (ARAMCO) Continental Contracting Co. (Conti-Tech) Non-Metallic A+ wrapping of 36” Crude Oil Pipeline in Khursaniyah.2018
Connection of new Hail City SIS # 8926 with 132 kV Network in Hail SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2017 - 2018
Construction of Two 132 KV DC OHL for Al-Badaya S/S 8851 in Qassim Area SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2017
Installation of 132 kV U/G Cable Circuits for S/S #8843 from BSP 9059 in Unaizah. SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2016 - 2018
Installation of 132 KV U/G Cable circuits from S/S 8846 up to BSP SS9025, Al-Russ SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2016
Construction & Installation of two Terminal Compounds at Al-Russ City SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) Civil works for the construction of terminal compounds 2016
Construction & Installation of Terminal Compound at SS#8814, Al-Assiyah, Qassim SAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) Civil works for the construction of terminal compound 2016
Installation of 132 KV U/G Cable circuits for S/S 8845 in Buraydah, Qassim AreaSAUDI ELECTRIC COMPANY Larsen & Toubro (L&T) UG Cabling works including Civil works 2015 - 2016
Design, Supply, Installation & testing of Fire water lineSAUDI ARABIAN OIL COMPANY (ARAMCO) WWWCivil, piping and pipeline work to furnish fire water line 2014 - 2016
Fire Alarm System for 56" EWG-2 Loop-2 & 56" KAEC Pipeline SAUDI ARABIAN OIL COMPANY (ARAMCO) DODSAL Civil, electrical and infrastructure works for camp facilities 2014 - 2015
Electrical Works for 56" EWG-2 Loop-2 & 56" KAEC Pipeline SAUDI ARABIAN OIL COMPANY (ARAMCO) DODSAL Civil, electrical and infrastructure works for camp facilities 2014 - 2015
Infrastructure facilities (Utility, Electrical, flood lighting, Civil, Fire Alarm, Fire Water, Installation of 500kva Generator sets) etc. SAUDI ARABIAN OIL COMPANY (ARAMCO) DODSAL Civil, electrical and infrastructure works for camp facilities 2014 - 2015
Precast of Valves Chambers for the Pipeline Project Ma’Aden GoldMetals Services for Trading & Cont. Co (MSTCC) Installation of ARV, WOV, and IV Chambers, precast of Valves Chambers for the Pipeline2012 - 2013